Skip to main content
Loading…
This section is included in your selections.

Water lines and other utility services to serve each lot and stubbed to property line prior to construction of street and pavement connected to existing city, public utility, or other approved system when such system is or can be made available. The subdivider shall present evidence from the proposed supplier that there is sufficient water availability and that the supplier will provide the required services to the subdivision and evidence that satisfactory agreements have been entered into to provide the services. (Ord. 2007-08 § 4 (Exh. A), 2007) (Ord. 2009-04, § 4(Exh. A), 2007)