Skip to main content
Loading…
This section is included in your selections.

Any prohibition street excavations approved by waiver under Section 15.60.050 shall be repaired with full lane-width paving on the street as follows:

A. Overlaid or reconstructed streets: all lanes that are affected shall be ground down two inches and repaved with two inches of similar asphalt concrete material as the previous treatment to the satisfaction of the engineer. Some streets may require rubberized asphalt of other materials.

B. Slurry sealed, chip sealed, or micro-surfaced streets: all lanes that are affected shall be resurfaced to the satisfaction of the engineer with a treatment similar to what was previously utilized.

C. A minimum of one foot on either side of the trench shall be resurfaced if the excavation is a lateral cut. For longitudinal trenches, the entire length plus one foot on either end shall be resurfaced.

D. Exception – Full lane width restoration shall not be required if either of the following applies:

1. The work is not defined as an excavation in Section 15.60.020;

2. The work performed on behalf of a low-income household in order to bring an owner-occupied single-family residence into compliance with sanitary sewer regulations at any time other than as part of the sale of the residence. Low-income is defined as up to eighty percent of area median family income. The purpose of this exception is to prevent hardship to property owners of limited means and it shall be interpreted and applied solely to achieve that purpose. (Ord. 2023-13 § 1 (Exh. A), 2023)