Skip to main content
Loading…
This section is included in your selections.

Section 1205.1.1.3 is added to read as follows:

1205.1.1.3 Secondary Power Sources. Where photovoltaic systems are interconnected to battery systems, generator backup systems, or other secondary power systems, additional signage acceptable to the fire code official shall be required indicating the location of the secondary power source shutoff switch.

(Ord. 2022-06 § 1 (Exh. A), 2022)