15.32.750 Section 907.7.2—Amended.
This section is included in your selections.
Section 907.7.2 is amended to read as follows:
907.7.2 Completion documents. The following documentation shall be provided at the time of acceptance testing for all fire alarm system installations:
1. A record of completion in accordance with NFPA 72.
2. A contractor’s statement verifying that the system has been installed in accordance with the approved plans and specifications and has been 100% tested in accordance with NFPA 72.
3. A contractor’s affidavit of personnel qualifications, indicating that all personnel involved with the installation of the fire alarm system meet the qualification requirements of the fire code official.
(Ord. 2022-06 § 1 (Exh. A), 2022)