Unless the permit provides otherwise:

A. All permit work shall conform to such of the following specifications as may be designated by the permit:

1. The Standard Specifications of the Department of Public Works of the state of California;

2. The Special Provisions for Encroachment Work, on file in the office of the road commissioner.

B. No tunneling, ponding or jetting shall be done.

C. With the exception of television cables laid in the highway pavement, no underground conduit, pipe, structure, or device shall be installed closer than two feet from the finished grade of any portion of the highway cross section.

D. Whenever, in the opinion of the road commissioner, an open excavation for a facility crossing a county highway transversely would unduly restrict the public use of such highway, such facility shall be jacked or otherwise forced beneath the highway improvements without disturbing the surface of the highway, and in no case shall the excavation for jacking devices be closer than five feet from the edge of any highway improvement, or lie within a prism formed by one-to-one slopes from said improvement to the bottom of the excavation. (Ord. 76-5 § 1, 1976)